Installation of steel structure pre-embedded parts

There are three main installation methods for steel structure pre-embedded parts:

pre-embedded parts


  • Bolt connection method: it is suitable for steel structure pre-embedded parts with smaller sizes or simpler specifications. This method has the advantages of simplicity ease of installation and fast installation speed.
  • Welding connection method: applicable to steel structure embedded parts with larger size or more complex specifications. This method has the advantages of firm connection and good stability. However, welding requires a certain level of skill and requires experienced welders to operate.
  • Presetting method: In some construction projects, the installation position of steel-embedded parts can be reserved in advance when the concrete is poured, and the installation can be carried out directly after the concrete is solidified. This method can reduce the damage to the concrete structure and improve the integrity of the building.
 💗💗💗💗💗💗

Explore the endless possibilities at https://www.cnxzlf.com

评论

此博客中的热门博文

Lifting construction of the starting unit frame of the large-span arched space frame

What is the degree of space frame processing?

What are the advantages of steel over traditional concrete?