Key Points for Quality Control in the Manufacturing and Installation of Bolted Spherical Steel Truss Structures(II)
III.Process control for the installation of bolted ball steel grid structures Bolted Spherical Grid Installation Process Before installing the space frame, installers must be familiar with all the members, ball types, dimensions, and their positions in the drawings. Any deformation of members caused during transportation, storage, or lifting must be corrected. All members and balls must be marked. During installation, they must be carefully checked against the drawings to ensure accuracy before installation. The installation of space frames primarily involves the connection between bolts and spheres. The friction surfaces of components must remain dry. High-strength bolts must be smoothly inserted into the sphere holes, with consistent insertion direction. They must be tightened in two stages, and each set of high-strength bolts must be fully tightened on the same day, with no bolts left untightened. Different installation processes must be adopted for different space frame configurat...