博文

目前显示的是标签为“dome space frame”的博文

Key Points of Quality Control in Ball-Point Space Frame Project

图片
1. S pace F rame   E ngineering Q uality C ontrol P rocess 1.1. S pace frame   construction process 1.1.1. The process flow of space frame   components processing Raw material selection and inspection   →   cutting   →   grounding and welding   →   rust removal and coating   →   packaging, marking, storage and transportation. 1.1.2.S pace frame   installation and construction process Check the base structure and embedded parts → measure and set off → sort and stack the space frame   parts → test the compound size of the small unit on site → connect and install the support → install the lower chord, web and upper chord → check the first space frame → in order Carry out the installation and inspection of each space frame→installation of roof panels and gutters → overall inspection of the space frame→cleaning→acceptance→dismantling of scaffolding → completion. 1.2. Quality control process of space frame   construction P...