What to do when space frame processing encounters bad weather



 The space frame processing company will introduce what to do when the space frame processing encounters bad weather. During the space frame processing, it is usually in a sunny weather environment, but there are also times when the weather is bad. How about frame processing? Let's take a look. In case of rain, it is recommended that you set up temporary shelters, and the rain should not fall on the hot welds. Welding parts should be wiped dry with a dry cloth before welding. Large components such as columns and main beams need to be corrected in windy weather during grid processing and fixed after correction to prevent unilateral instability. In addition, when the weather is relatively humid, the storage electrode should be moisture-proof and baked, and the same electrode should not be repeatedly baked more than twice.

In bad weather, the corresponding preparation work is done, and space frame processing can also be carried out to ensure the processing quality. We often encounter a lot of bad weather when we are constructing the grid. In this environment, we cannot stop the construction of the grid because of the unsatisfactory environment. Therefore, we should pay attention to some problems during construction in a lot of rainy weather. How to carry out the construction of the space frame in bad weather. The components cannot be painted in rainy weather. When the project is under construction on rainy days, temporary protective sheds should be set up for the space frame project, and rainwater should not fall on the hot welds.

If the welding part is wet, it must be cleaned with a dry cloth and dried with an oxyacetylene flame before welding to keep the joint dry and no residual moisture. Because the air is relatively humid in rainy days, the welding rod should be stored in moisture-proof and baked. The repeated baking of the same welding rod should not exceed twice, and the management personnel should make a baking record in time. In the event of windy weather during construction, large components such as columns, main beams, supports, etc. should be corrected immediately, and they should be permanently fixed immediately after the correct position is corrected to prevent unilateral instability. The components installed on the same day should form a spatial stability system. Roof insulation construction cannot be carried out on rainy days and strong winds above level 5. 

评论

此博客中的热门博文

Several cutting methods of steel structure space frame

What are the advantages of steel over traditional concrete?

Space frame cost control