博文

目前显示的是 八月, 2025的博文

How Steel Canopies Shield Southeast Asian School Arenas

图片
For international schools in Manila, Jakarta, and Ho Chi Minh City, outdoor sports events face twin threats: monsoon downpours halt games while aging concrete bleachers risk collapse. As a global steel structure specialist with 50+ ASEAN projects, we engineer typhoon-defying spectator canopies—where safety meets spectacle. As a global steel structure expert with over 50 projects under our belt, we designed a typhoon-resistant spectator canopy that combines safety with spectacular views. 3 Pain Points You Can’t Ignore Monsoon Disruption Your chaos: Manila’s 200mm/hr rains cancel 40% of annual sports events → parent complaints + revenue loss. Our shield: Slope-optimized roofs drain 4X faster than standard designs + 150μm hot-dip galvanizing protects against salt corrosion. Structural Peril Your fear:   B leacher collapse injures students during monsoon winds. Our safety: Seismic-braced frames withstand 200km/h winds + real-time load sensors. Budget ...

How to perform high-altitude bulk loading of space frame processing structures?

图片
  1. When using small assembly units or members for direct assembly at high elevations, the sequence should ensure assembly accuracy and minimize cumulative errors. When using the cantilever method, the structure should first be assembled into a system capable of supporting its own weight, followed by gradual expansion. During the assembly process of space frame fabrication, the positions of reference axes, elevations, and deviations should be checked at all times, and corrections should be made promptly. 2. When erecting assembly scaffolding, the support points on the scaffolding should be located at the lower chord nodes. The scaffolding should be verified for its load-bearing capacity and stability, and load testing may be conducted as necessary to ensure safety and reliability. Measures should be taken under the scaffolding columns to prevent foundation settlement. 3. During the removal of the scaffolding, individual support points should be prevented from bearing concentrated...

Key Points for Quality Control in the Manufacturing and Installation of Bolted Spherical Steel Truss Structures(II)

图片
III.Process control for the installation of bolted ball steel grid structures Bolted Spherical Grid Installation Process Before installing the space frame, installers must be familiar with all the members, ball types, dimensions, and their positions in the drawings. Any deformation of members caused during transportation, storage, or lifting must be corrected. All members and balls must be marked. During installation, they must be carefully checked against the drawings to ensure accuracy before installation. The installation of space frames primarily involves the connection between bolts and spheres. The friction surfaces of components must remain dry. High-strength bolts must be smoothly inserted into the sphere holes, with consistent insertion direction. They must be tightened in two stages, and each set of high-strength bolts must be fully tightened on the same day, with no bolts left untightened. Different installation processes must be adopted for different space frame configurat...